{"id":1464,"date":"2026-09-24T00:19:44","date_gmt":"2026-09-24T00:19:44","guid":{"rendered":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/"},"modified":"2026-09-28T07:05:03","modified_gmt":"2026-09-28T07:05:03","slug":"short-circuit-withstand-cable-sizing","status":"publish","type":"post","link":"https:\/\/luliancable.com\/es\/short-circuit-withstand-cable-sizing\/","title":{"rendered":"Short-circuit withstand: sizing the conductor and the copper wire screen"},"content":{"rendered":"<div class=\"lllv\">\n<div class=\"sec\">\n<div class=\"wrap\">\n<p class=\"k\">\u00a701 \u2014 PROTECTION<\/p>\n<p class=\"note\">Published 2026-09-24 \u00b7 Engineering note<\/p>\n<p>A cable that carries the load current and passes the voltage drop check can still be wrong. If a fault occurs at the near end of the feeder and the protection takes a second to clear it, the conductor has to survive that second without being damaged. This is usually the constraint that sets the minimum section on feeders close to a substation, in the same way voltage drop sets it on long rural routes.<\/p>\n<\/div>\n<\/div>\n<div class=\"sec\">\n<div class=\"wrap\">\n<p class=\"k\">\u00a702 \u2014 THE CHECK<\/p>\n<h2>Adiabatic short-circuit check<\/h2>\n<p>The standard approach treats the fault duration as too short for heat to escape, so all the energy stays in the conductor:<\/p>\n<p class=\"note\">S \u2265 (I \u00d7 \u221at) \/ k<\/p>\n<p>S is the required conductor cross-section in mm\u00b2, I the prospective fault current in amperes, t the protection clearing time in seconds, and k a material and insulation constant. The formula is the adiabatic method; for longer durations or very large sections the non-adiabatic method in IEC 60949 gives a slightly lower requirement.<\/p>\n<h3>k values in common use<\/h3>\n<table>\n<tr>\n<th>Conductor<\/th>\n<th>Aislamiento<\/th>\n<th>k<\/th>\n<th>Initial \/ final temperature<\/th>\n<\/tr>\n<tr>\n<td>Copper<\/td>\n<td>XLPE<\/td>\n<td>143<\/td>\n<td>90 \u00b0C \/ 250 \u00b0C<\/td>\n<\/tr>\n<tr>\n<td>Copper<\/td>\n<td>PVC<\/td>\n<td>115<\/td>\n<td>70 \u00b0C \/ 160 \u00b0C<\/td>\n<\/tr>\n<tr>\n<td>Aluminium<\/td>\n<td>XLPE<\/td>\n<td>94<\/td>\n<td>90 \u00b0C \/ 250 \u00b0C<\/td>\n<\/tr>\n<tr>\n<td>Aluminium<\/td>\n<td>PVC<\/td>\n<td>76<\/td>\n<td>70 \u00b0C \/ 160 \u00b0C<\/td>\n<\/tr>\n<\/table>\n<p class=\"note\">Values as tabulated in IEC 60364-5-54. Where a conductor is also a protective conductor, or where joints are involved, confirm the applicable value \u2014 a joint is often the thermal weak point.<\/p>\n<\/div>\n<\/div>\n<div class=\"sec\">\n<div class=\"wrap\">\n<p class=\"k\">\u00a703 \u2014 WORKED CHECK<\/p>\n<h2>26 kA for one second, 11 kV feeder<\/h2>\n<p>Prospective fault current 26 kA, protection clears in 1 s, XLPE insulated copper cable.<\/p>\n<p class=\"note\">S \u2265 (26 000 \u00d7 \u221a1) \/ 143 = 182 mm\u00b2<\/p>\n<p>The next standard section is 185 mm\u00b2, so a 185 mm\u00b2 copper XLPE cable just passes. Two things follow from that. First, the margin is nil \u2014 any increase in fault level or clearing time pushes the requirement above 185 mm\u00b2. Second, the same feeder in aluminium would need 26 000 \/ 94 = 277 mm\u00b2, so 300 mm\u00b2, which is a two-step jump for the same duty.<\/p>\n<p>Because I\u00b2t is what matters, the check scales predictably. If the same 26 kA is cleared in 0.5 s instead of 1 s, the requirement falls to 26 000 \u00d7 \u221a0.5 \/ 143 = 129 mm\u00b2. Faster protection is worth more than copper. This is why the fault level and the protection settings belong in the cable enquiry, not just the load current.<\/p>\n<\/div>\n<\/div>\n<div class=\"sec\">\n<div class=\"wrap\">\n<p class=\"k\">\u00a704 \u2014 THE SCREEN IS A SEPARATE CASE<\/p>\n<h2>What the copper wire screen does under fault<\/h2>\n<div class=\"grid3\">\n<div class=\"card\">\n<div class=\"num\">ROLE 01<\/div>\n<h3>Electric field control<\/h3>\n<p>The screen holds the outer surface of the insulation at earth potential, which is what makes the field within the insulation predictable. Remove it or make it discontinuous and the design assumptions no longer hold.<\/p>\n<\/div>\n<div class=\"card\">\n<div class=\"num\">ROLE 02<\/div>\n<h3>Fault current path<\/h3>\n<p>In a single-core cable bonded at both ends, the screen carries induced current during normal operation and a share of the fault current during a fault. Both are thermal duty on a section that is much smaller than the conductor.<\/p>\n<\/div>\n<div class=\"card\">\n<div class=\"num\">ROLE 03<\/div>\n<h3>Earth fault return<\/h3>\n<p>On many distribution networks the screen is the earth fault return path. Its section then has to be checked against the earth fault current and duration, not the three-phase fault.<\/p>\n<\/div>\n<\/div>\n<p>The screen section is specified in IEC 60502-2 for the relevant construction, and the thermal duty is assessed using the short-circuit temperature rise method in IEC 60949 with the screen&#8217;s own starting temperature and permissible final temperature. Because the screen has far less copper than the conductor, it reaches its limit sooner \u2014 a screen that is adequate for the three-phase fault can be inadequate for a sustained earth fault on a single-end-bonded section. If your network relies on the screen as the fault return, say so in the enquiry so the construction is selected for it rather than defaulted.<\/p>\n<p class=\"note\">This is also where earthing arrangement stops being an installation detail and becomes a cable specification item. Single-point bonding, cross-bonding and both-end bonding give different screen duties and different permissible lengths.<\/p>\n<\/div>\n<\/div>\n<div class=\"sec\">\n<div class=\"wrap\">\n<p class=\"k\">\u00a705 \u2014 ORDERING<\/p>\n<h2>Information the supplier needs<\/h2>\n<p>Four numbers determine the answer: prospective fault current, protection clearing time, system voltage and earthing arrangement. Load current and route length are separate checks that run alongside. Without the first four, a supplier can only quote a plausible cable rather than the correct one.<\/p>\n<p>The <a href=\"\/es\/products\/medium-high-voltage-cable\/\">6\u201335 kV medium voltage range<\/a> lists conductor sections and screen constructions by voltage class. Detailed construction and test data for the 6.35\/11 kV class is on the <a href=\"\/es\/products\/medium-high-voltage-cable\/11kv-xlpe-cable\/\">11 kV XLPE cable page<\/a>, and the 19\/33 kV class is covered on the <a href=\"\/es\/products\/medium-high-voltage-cable\/33kv-xlpe-cable\/\">33 kV page<\/a>. If the feeder also has a long route, check <a href=\"\/es\/voltage-drop-medium-voltage-feeder\/\">voltage drop<\/a> before fixing the section \u2014 the two checks sometimes point at different sizes.<\/p>\n<\/div>\n<\/div>\n<div class=\"sec\">\n<div class=\"wrap\">\n<p class=\"k\">\u00a706 \u2014 Preguntas frecuentes<\/p>\n<h2>Questions this raises<\/h2>\n<details>\n<summary>Which fault current should be used \u2014 three-phase or earth fault?<\/summary>\n<div class=\"a\">\n<p>Both, because they load different parts. The three-phase fault current sets the conductor requirement. The earth fault current sets the screen or armour requirement where those form the return path. On solidly earthed networks the earth fault current can be the larger of the two.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Does the check change if the cable runs in a duct or in air?<\/summary>\n<div class=\"a\">\n<p>Not for the adiabatic short-circuit check, because heat is assumed not to escape during the fault. Installation method affects the continuous current rating, which is a separate calculation.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>What about joints?<\/summary>\n<div class=\"a\">\n<p>A joint is a thermal discontinuity and is often the limiting element rather than the cable. Where the fault level is close to the cable limit, ask for the joint rating as well, and consider whether the joint position can be moved away from the high-fault end of the feeder.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Is 250 \u00b0C permissible final temperature realistic for XLPE?<\/summary>\n<div class=\"a\">\n<p>It is the short-circuit value used in the standard, not a continuous rating. XLPE is rated 90 \u00b0C continuous. The 250 \u00b0C figure applies only for the duration of the fault and assumes the cable is not required to carry load again until it has cooled back to its normal operating temperature.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>How does this interact with voltage drop sizing?<\/summary>\n<div class=\"a\">\n<p>They are independent limits and the larger governs. A feeder near a substation is usually limited by short-circuit withstand; a long rural feeder is usually limited by voltage drop. When a site needs both a large section for drop and a large screen for fault return, the construction should be selected for both explicitly rather than assumed.<\/p>\n<\/div>\n<\/details>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Thermal short-circuit sizing for copper and aluminium conductors: the k values from IEC 60364-5-54, a worked example at 26 kA, and the copper wire screen check most datasheets leave out.<\/p>","protected":false},"author":1,"featured_media":1406,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-1464","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Short-Circuit Withstand: Sizing Conductor &amp; Screen | Lulian<\/title>\n<meta name=\"description\" content=\"Size conductors and copper wire screens for short-circuit duty: the adiabatic equation, k factors, screen cross-section checks and worked examples.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/luliancable.com\/es\/short-circuit-withstand-cable-sizing\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Short-Circuit Withstand: Sizing Conductor &amp; Screen | Lulian\" \/>\n<meta property=\"og:description\" content=\"Size conductors and copper wire screens for short-circuit duty: the adiabatic equation, k factors, screen cross-section checks and worked examples.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/luliancable.com\/es\/short-circuit-withstand-cable-sizing\/\" \/>\n<meta property=\"og:site_name\" content=\"Lulian Cable\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61590602855329\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-24T00:19:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-28T07:05:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/luliancable.com\/wp-content\/uploads\/2026\/09\/lulian-factory-conductor-die.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1279\" \/>\n\t<meta property=\"og:image:height\" content=\"1578\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Lulian Cable\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lulian Cable\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/\"},\"author\":{\"name\":\"Lulian Cable\",\"@id\":\"https:\\\/\\\/luliancable.com\\\/#\\\/schema\\\/person\\\/6d8d074528b2669fd53492599ee4d6e5\"},\"headline\":\"Short-circuit withstand: sizing the conductor and the copper wire screen\",\"datePublished\":\"2026-09-24T00:19:44+00:00\",\"dateModified\":\"2026-09-28T07:05:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/\"},\"wordCount\":1015,\"image\":{\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/luliancable.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/lulian-factory-conductor-die.webp\",\"articleSection\":[\"Cable Industry News &amp; Market Insights\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/\",\"url\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/\",\"name\":\"Short-Circuit Withstand: Sizing Conductor & Screen | Lulian\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/luliancable.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/luliancable.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/lulian-factory-conductor-die.webp\",\"datePublished\":\"2026-09-24T00:19:44+00:00\",\"dateModified\":\"2026-09-28T07:05:03+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/luliancable.com\\\/#\\\/schema\\\/person\\\/6d8d074528b2669fd53492599ee4d6e5\"},\"description\":\"Size conductors and copper wire screens for short-circuit duty: the adiabatic equation, k factors, screen cross-section checks and worked examples.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/luliancable.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/lulian-factory-conductor-die.webp\",\"contentUrl\":\"https:\\\/\\\/luliancable.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/lulian-factory-conductor-die.webp\",\"width\":1279,\"height\":1578,\"caption\":\"Conductor drawing die used in copper wire drawing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/luliancable.com\\\/short-circuit-withstand-cable-sizing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/luliancable.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Short-circuit withstand: sizing the conductor and the copper wire screen\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/luliancable.com\\\/#website\",\"url\":\"https:\\\/\\\/luliancable.com\\\/\",\"name\":\"Lulian Cable\",\"description\":\"Shandong Lulian Cable Co., Ltd.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/luliancable.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/luliancable.com\\\/#\\\/schema\\\/person\\\/6d8d074528b2669fd53492599ee4d6e5\",\"name\":\"Lulian Cable\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/30e12aff12b72c7198c412c8b573f5746c2f02ffbaef690960fec693a2d70845?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/30e12aff12b72c7198c412c8b573f5746c2f02ffbaef690960fec693a2d70845?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/30e12aff12b72c7198c412c8b573f5746c2f02ffbaef690960fec693a2d70845?s=96&d=mm&r=g\",\"caption\":\"Lulian Cable\"},\"sameAs\":[\"http:\\\/\\\/luliancable.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Short-Circuit Withstand: Sizing Conductor & Screen | Lulian","description":"Size conductors and copper wire screens for short-circuit duty: the adiabatic equation, k factors, screen cross-section checks and worked examples.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/luliancable.com\/es\/short-circuit-withstand-cable-sizing\/","og_locale":"es_ES","og_type":"article","og_title":"Short-Circuit Withstand: Sizing Conductor & Screen | Lulian","og_description":"Size conductors and copper wire screens for short-circuit duty: the adiabatic equation, k factors, screen cross-section checks and worked examples.","og_url":"https:\/\/luliancable.com\/es\/short-circuit-withstand-cable-sizing\/","og_site_name":"Lulian Cable","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=61590602855329","article_published_time":"2026-09-24T00:19:44+00:00","article_modified_time":"2026-09-28T07:05:03+00:00","og_image":[{"width":1279,"height":1578,"url":"https:\/\/luliancable.com\/wp-content\/uploads\/2026\/09\/lulian-factory-conductor-die.webp","type":"image\/webp"}],"author":"Lulian Cable","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Lulian Cable","Tiempo de lectura":"5 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/#article","isPartOf":{"@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/"},"author":{"name":"Lulian Cable","@id":"https:\/\/luliancable.com\/#\/schema\/person\/6d8d074528b2669fd53492599ee4d6e5"},"headline":"Short-circuit withstand: sizing the conductor and the copper wire screen","datePublished":"2026-09-24T00:19:44+00:00","dateModified":"2026-09-28T07:05:03+00:00","mainEntityOfPage":{"@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/"},"wordCount":1015,"image":{"@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/#primaryimage"},"thumbnailUrl":"https:\/\/luliancable.com\/wp-content\/uploads\/2026\/09\/lulian-factory-conductor-die.webp","articleSection":["Cable Industry News &amp; Market Insights"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/","url":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/","name":"Short-Circuit Withstand: Sizing Conductor & Screen | Lulian","isPartOf":{"@id":"https:\/\/luliancable.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/#primaryimage"},"image":{"@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/#primaryimage"},"thumbnailUrl":"https:\/\/luliancable.com\/wp-content\/uploads\/2026\/09\/lulian-factory-conductor-die.webp","datePublished":"2026-09-24T00:19:44+00:00","dateModified":"2026-09-28T07:05:03+00:00","author":{"@id":"https:\/\/luliancable.com\/#\/schema\/person\/6d8d074528b2669fd53492599ee4d6e5"},"description":"Size conductors and copper wire screens for short-circuit duty: the adiabatic equation, k factors, screen cross-section checks and worked examples.","breadcrumb":{"@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/#primaryimage","url":"https:\/\/luliancable.com\/wp-content\/uploads\/2026\/09\/lulian-factory-conductor-die.webp","contentUrl":"https:\/\/luliancable.com\/wp-content\/uploads\/2026\/09\/lulian-factory-conductor-die.webp","width":1279,"height":1578,"caption":"Conductor drawing die used in copper wire drawing"},{"@type":"BreadcrumbList","@id":"https:\/\/luliancable.com\/short-circuit-withstand-cable-sizing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/luliancable.com\/"},{"@type":"ListItem","position":2,"name":"Short-circuit withstand: sizing the conductor and the copper wire screen"}]},{"@type":"WebSite","@id":"https:\/\/luliancable.com\/#website","url":"https:\/\/luliancable.com\/","name":"Lulian Cable","description":"Shandong Lulian Cable Co., Ltd.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/luliancable.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Person","@id":"https:\/\/luliancable.com\/#\/schema\/person\/6d8d074528b2669fd53492599ee4d6e5","name":"Lulian Cable","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/30e12aff12b72c7198c412c8b573f5746c2f02ffbaef690960fec693a2d70845?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/30e12aff12b72c7198c412c8b573f5746c2f02ffbaef690960fec693a2d70845?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30e12aff12b72c7198c412c8b573f5746c2f02ffbaef690960fec693a2d70845?s=96&d=mm&r=g","caption":"Lulian Cable"},"sameAs":["http:\/\/luliancable.com"]}]}},"_links":{"self":[{"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/posts\/1464","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/comments?post=1464"}],"version-history":[{"count":5,"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/posts\/1464\/revisions"}],"predecessor-version":[{"id":1740,"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/posts\/1464\/revisions\/1740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/media\/1406"}],"wp:attachment":[{"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/media?parent=1464"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/categories?post=1464"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/luliancable.com\/es\/wp-json\/wp\/v2\/tags?post=1464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}